APPLICATION AND DESIGN OF PRODUCTION ROOM LAYOUT WITH 5S – ARC METHOD TO REDUCE WASTE (CASE
STUDY ON RUBBER INDUSTRY PRODUCTION)

Aldilo Dwi Rashindra1, Ghiyats Septio Zulkarnaen2*, Yosi Pahala3, Deslida Saidah4

1,2,3,4Trisakti Institute of Transportation and Logistics Jakarta IPN Kebon Nanas
Street No.2, Cipinang Besar Sel., Jatinegara District, East Jakarta City, Special
Capital Region of Jakarta 13410
1This email address is being protected from spambots. You need JavaScript enabled to view it., 2*This email address is being protected from spambots. You need JavaScript enabled to view it., 3This email address is being protected from spambots. You need JavaScript enabled to view it.,
4This email address is being protected from spambots. You need JavaScript enabled to view it.



ABSTRACT


This study aims to get good production facility layout recommendations to reduce material handling distance in the company. This is intended so that the production process can run optimally. This study examined the rubber processing industry located in Bogor patent where the production process in this industry still uses simple methods. This causes a significant amount of waste in the production system in the industry. Therefore, this study discussed the redesign of the production room layout by using ARC proximity (Activity Relation Chart), which is a method to see the level of intimacy between activities in the production process. It also examines the work culture in industrial production using the 5S method. The results of this study show that there is a reduction in the distance and time of movement of goods in the production process with 2 alternative layout proposals contained in this scientific research.


Keywords: Industrial Production, Production Layout, Relation Chart

 

Published On: 10 April 2023

 

Full Download